1. To add a new modification, press the "Add new modification" button in the budget module, or go to the "Additions and modifications" module and press the "Add new modification" button there.
or
2. The following fields must be filled in, regardless of whether you press the button to add a modification in the budget module or in the Additions and modifications module.
Job number - This is the sequence number of the modification. You can set it yourself or use the automatic numbering provided by Bauwise. For this example, I use automatic numbering.
Type - It is possible to specify the type of modification. It provides the ability to filter modifications, nothing else depends on it. Types can be changed/set by pressing the "Manage types" button. In this example, the type is Internal.
Description - Description of the content of the modification.
Date - The date of the modification.
3. To add a new job line, press the "Add new line" button:
4. After pressing the button, a new line without a job code will appear:
5. By clicking on the green cell in the "subcontractor contract" column, a list of all project contracts will appear where work can be assigned. In this case, there is only one contract - "001 Design works". If the added work is not related to any contract, it must be assigned under unsigned contracts.
6. Since it is a new job that is not yet in the budget, a unique job code must be assigned to the job that does not exist in the budget. In this case, I enter 0001 and press "Add new job code 0001":
7. Next, I name the job, in this example "Junk house foundation" and determine the cost. Since the work falls under unsigned contracts, we do not have a Subcontractor, the cell "Subcontractor Budget" cannot be filled in.
8. Sama protseduuri korrates lisan ka ülejäänud prügimaja ehituse read: Repeating the same procedure, I also add the rest of the lines for the junk house construction:
9. When all lines are entered, I press "Confirm additions" and the lines appear in the budget: